Crane erection on Terry

Here is the foundation poured to anchor the tower crane, as of Friday afternoon, as seen from the 7th floor of the Harborview office building to the south.

Here is what the site looked like Saturday, mid morning. The tower is attached and built up with the tall temporary crane. They are starting to assemble the horizontal part on the ground.

For the rest of the assembly sequence, it is here.

About William Calvin

UW prof emeritus brains, human evolution, climate
This entry was posted in Uncategorized. Bookmark the permalink.